Internal combustion engine, straddled vehicle, and method for manufacturing internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10823108
APP PUB NO 20200325845A1
SERIAL NO

16775459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine includes a cylinder head including a first valve lifter hole, a first camshaft rotatably supported on the cylinder head, a first valve lifter inserted in the first valve lifter hole, a first valve spring that biases the first valve lifter toward the first cam of the first camshaft, and an oil supply passage having a first oil supply port formed on the inner circumferential surface of the first valve lifter hole and a first passage connected to the first oil supply port. An upper end of the first oil supply port is located upward relative to the upper surface of the first valve lifter when the first valve lifter is in the lower position. A lower end of the first oil supply port is located downward relative to the upper surface of the first valve lifter when the first valve lifter is in the upper position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMAHA HATSUDOKI KABUSHIKI KAISHA2500 SHINGAI IWATA-SHI SHIZUOKA 4388501 ?4388501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyata, Manabu Iwata, JP 39 804

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00