Method for producing aluminum nitride single crystal substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10822718
APP PUB NO 20190093255A1
SERIAL NO

16085322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an AlN single crystal substrate, the method including: i) preparing a first base substrate consisting of a first AlN single crystal; ii) growing a first AlN single crystal layer over a main face of the first base substrate, to obtain a layered body; iii) cutting the first MN single crystal layer of the layered body, to separate the layered body into a second base substrate and a first part of the first AlN single crystal layer, the second base substrate including the first base substrate and a thin film layered thereon, the thin film being a second part of the first AlN single crystal layer; iv) polishing a surface of the thin film, to obtain a third base substrate consisting of a second AlN single crystal; and v) growing a second AlN single crystal layer over the polished surface of the third base substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKUYAMA CORPORATIONSHUNAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Masayuki Shunan, JP 44 578
Nagashima, Toru Shunan, JP 24 103
Okayama, Reiko Shunan, JP 2 9
Yanagi, Hiroyuki Shunan, JP 34 253

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00