Prioritizing file synchronization in a distributed computing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10817477
APP PUB NO 20180225303A1
SERIAL NO

15945795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some examples include performing a priority synchronization of a computing device to download a selected set of data files to the computing device from a distributed backup system. Data files are downloaded to a computing device by synchronizing with a server of the distributed backup system. A priority sync downloads a subset of the data files as priority files, rather than all of the data files of the user, thereby minimizing the computing resources consumed to download the data files. The priority sync can select the priority files based on various criteria, including an access pattern of the data files, attributes of the data files, or attributes of the computing device. The priority sync may also download non-priority files. The priority files may be downloaded in their original format and the non-priority files may be downloaded in a downgraded format.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAZER (ASIA-PACIFIC) PTE LTDRAZER SEA HQ 1 ONE-NORTH CRESCENT #02-01 SINGAPORE 138538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bornstein, Daniel R San Francisco, US 49 854
Chan, Michael A San Francisco, US 95 1803
Moss, Tom Los Altos, US 64 1419
Quan, Justin San Francisco, US 86 1532
Tong, Linda San Francisco, US 51 1014

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00