Method and system for predicting effect of a transient event on a data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10817033
APP PUB NO 20190187764A1
SERIAL NO

15841599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for predicting the effect of a transient event on a data center. A method comprises receiving input data related to a data center that includes at least one equipment rack and at least one cooling provider, the input data including data center architecture information, building data, and operating data, generating, a model based at least in part on the input data and on a set of energy balance and heat exchange equations for the data center that account for removed and added heat and a thermal mass of the at least one equipment rack and a thermal mass of the at least one cooling provider, the model configured to predict at least one temperature in the data center during a transient event, and controlling a display device to display the at least one predicted temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC IT CORPORATION70 MECHANIC STREET FOXBORO MA 02035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Healey, Christopher M Tewksbury, US 14 221
Spitaels, James S Shrewsbury, US 49 1735
VanGilder, James William Pepperell, US 30 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00