Internal combustion engine control device and internal combustion engine control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10815914
SERIAL NO

16609301

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The control device includes a microcomputer which controls operation of the internal combustion engine, a power regulator which outputs a direct current regulated voltage regulated from electric power of the AC generator, a 5V regulator which receives an output from the power regulator and supplies it to the microcomputer; a first capacitor with a small capacity connected to an output of the power regulator, plural second capacitors connected in parallel with the first capacitor; and plural opening and closing means connected in series to the plural second capacitors, respectively. The opening and closing means are controlled to be opened and closed by the microcomputer so that the second capacitors are charged when the output of the power regulator has reached an ON voltage below the regulated voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBHSTUTTGART GERMANY STUTTGART BADEN-WURTTEMBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sekita, Tomoaki Numazu, JP 10 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00