In line degumming and neutralization of oils and fats using hydrodynamic flow-through cavitation reactors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10808202
APP PUB NO 20200239809A1
SERIAL NO

16693658

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the combined degumming and neutralization of an oil containing phosphatides and FFA, the process comprising: dosing an aqueous degumming reactant into the oil to form a mixture; introducing the mixture into a first set of flow-through hydrodynamic cavitation reactors to form at the exit of the first set of flow-through hydrodynamic cavitation reactors a mixture; dosing, at the exit of the first set of flow-through hydrodynamic cavitation reactors an aqueous caustic solution into the oil to form a mixture of aqueous caustic dispersed into the oil; introducing the mixture of an aqueous caustic dispersed into the oil into a second set of flow-through hydrodynamic cavitation reactors to form a mixture of oil containing hydrated phosphatides and neutralized FFA (soaps); and separating the mixture of oil containing hydrated phosphatides and soaps to obtain an oil phase and an aqueous phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DESMET BELGIUMDE KLEETLAAN 7B MACHELEN 1831

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kellens, Marc Mechelen-Muizen, BE 34 176
Van, Den Schrieck Vincent Sint-Pieters-Leeuw, BE 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00