Adsorbent circulation for onboard octane on-demand and cetane on-demand

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10801422
SERIAL NO

16551047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicular propulsion system, a vehicular fuel system and a method of operating an internal combustion engine. A separation unit that makes up a part of the fuel system may selectively receive and separate at least a portion of onboard fuel and a flowable adsorbent in order to separate the fuel into octane-enhanced and cetane-enhanced fuel components. A controller may be used to determine a particular operating condition of the internal combustion engine such that the onboard fuel can be sent to one or more combustion chambers within the internal combustion engine without first passing through the separation unit during one operating condition, or instead to the separation unit in situations where the internal combustion engine may require an octane-rich or cetane-rich mixture in another operating condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amer, Amer A Dhahran, SA 183 54
Chang, Junseok Dhahran, SA 21 149
Hamad, Esam Zaki Dhahran, SA 38 317
Tora, Eman AbdelHakim A M Faisal, EG 7 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00