Method and material for accomplishing ignition mitigation in tanks containing flammable liquid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10800541
APP PUB NO 20190055031A1
SERIAL NO

16165609

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The use of flexible foam material to provide ignition mitigation in fuel tanks is described. In one example, a system for ignition mitigation includes a number of foam blocks, wherein each foam block is pre-cut from a flexible foam material. Each foam block can have a unique profile corresponding to inner surfaces of a fuel tank at a particular sector within a compartment of the fuel tank. In other aspects, one or more of the foam blocks can include one or more upper cutouts to provide clearance for upper stiffeners in the fuel tank, one or more lower cutouts to provide clearance for lower stiffeners in the fuel tank, and one or more arcuate cutouts to provide clearance for a tank fuel pump. The foam blocks can be arranged in a stack corresponding to a sequential installation at respective sectors within the compartment of the fuel tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JETAIRE AEROSPACE LLC1170 PEACHTREE STREET SUITE 1200 ATLANTA GA 30309

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Williams, Michael D Fayetteville, US 89 2415

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00