Table saw with pulley alignment mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10799964
APP PUB NO 20160263671A1
SERIAL NO

15060699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a table saw assembly includes a motor assembly, an electrically conductive belt operably connected to the motor assembly, an arbor shaft operably connected to the belt, a drop arm assembly rotatably supporting the arbor shaft, a first pulley rotatably supporting the belt, the first pulley including an inner component defining an inner bore and an outer component defining an outer surface, the first pulley configured to electrically isolate the inner bore from the outer surface, and an alignment adjustment mechanism operably connected to the first pulley, the alignment adjustment mechanism configured to selectably position the first pulley along an axis of rotation of the first pulley.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH TOOL CORPORATION1800 WEST CENTRAL ROAD MOUNT PROSPECT IL 60056
ROBERT BOSCH GMBHPOSTFACH 30 02 20 70442 STUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doumani, Robert S Hoffman Estates, US 20 237
Szweda, Timothy Chicago, US 19 71
Taylor, Brian Elmhurst, US 95 2067

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00