Nuclear reactor fuel rod and fuel assembly having bundled same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10796807
APP PUB NO 20170330638A1
SERIAL NO

15529663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear reactor fuel rod is a fuel rod for a light-water reactor. The nuclear reactor fuel rod includes a fuel cladding tube and an end plug, both of which are formed of a silicon carbide material. A bonding portion between the fuel cladding tube and the end plug is formed by brazing with a predetermined metal bonding material interposed, and/or by diffusion bonding. The predetermined metal bonding material has a solidus temperature of 1200° C. or higher. An outer surface of the bonding portion, and a portion of an outer surface of the fuel cladding tube and the end plug, which is adjacent to the outer surface of the bonding portion are covered by bonding-portion coating formed of a predetermined coating metal. The predetermined metal bonding material and the predetermined coating metal have an average linear expansion coefficient which is less than 10 ppm/K.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aota, Kinya Tokyo, JP 85 1160
Ishibashi, Ryou Tokyo, JP 3 2
Kita, Hideki Nagoya, JP 44 841
Yamashita, Seiji Nagoya, JP 92 572
Zhang, Xudong Tokyo, JP 86 148

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00