Ignition device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10790085
APP PUB NO 20180277302A1
SERIAL NO

15920539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition coil includes a first winding, a second winding, and a third winding. A first switch is electrically connected to the first winding. A battery is electrically connected to the first winding. A booster is electrically connected to the battery. A second switch is electrically connected to the third winding. A drive device drives the first switch and the second switch. The drive device turns the first switch from on-state to off-state to allow a secondary current to flow through the second winding, turns the second switch from off-state to on-state to supply an output of the booster to the third winding, and superimpose a second current to the second winding. When a third winding current becomes equal to or greater than a predetermined value, the booster controls such that power generated by the third winding current and an output voltage of the booster is restricted to constant power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661
SANKEN ELECTRIC CO LTD3-6-3 KITANO NIIZA-SHI SAITAMA-KEN 352-8666

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sekine, Nobuaki Kawagoe, JP 5 10
Takeda, Shunichi Kariya, JP 32 149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00