Electrochromic device including a transparent conductive oxide layer and a bus bar and a process of forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10788724
APP PUB NO 20190155121A1
SERIAL NO

16250802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrochromic device can include a substrate, a transparent conductive oxide layer over the substrate, and a bus bar over the substrate. The bus bar can include silver and has a resistivity of at most 6.7×10−6 Ω*cm, an average adhesion strength to SiO2 of at least 3N based on 20 measurements, as determined by Method A of ASTM B905-00 (Reapproved 2010), or a classification of at least 4, as determined by Method B of ASTM B905-00 (Reapproved 2010). In another aspect a process of forming an electrochromic device can include forming a transparent conductive oxide layer over a substrate; forming a bus bar precursor over the substrate, wherein the precursor includes silver; and firing the precursor to form a bus bar. Firing can be performed such that the first bus bar is at a temperature of at least 390° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAGE ELECTROCHROMICS INCFARIBAULT MN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brossard, Sophie Paris, FR 12 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00