Method for the calibration of a top drive and top drive for a drill string

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10788390
SERIAL NO

16000356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A top drive for a drill string, and an apparatus and method for calibrating the top drive. The top drive includes a rotationally driven shaft that is rotatably mounted by a bearing arrangement having at least one axial bearing and at least one load measuring cell for measuring an axial load of the at least one axial bearing. A calibration device including a pressure element is placed at an upper end portion of the drive shaft. The pressure element exerts a defined calibration force onto the drive shaft in an axial direction. The at least one load measuring cell measures the axial load and transmits a measured load value to a comparing unit, which compares the measured load value with the defined calibration force to determine a differential value. The differential value is then used to calibrate the at least one load measuring cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAUER MASCHINEN GMBH86529 SCHROBENHAUSEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Otto, Philipp Aichach, DE 2 0
Soier, Sebastian Schrobenhausen, DE 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00