Injection feedwater heater for steam power generating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10788204
SERIAL NO

16051431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An injection feedwater heater for a steam power generating system includes at least one main heater body and at least one injection nozzle. The main heater body has at least one heat exchange compartment, at least one water inlet, at least one steam inlet, and at least one water outlet formed on the main heater body. The injection nozzle is provided in the main heater body at a position adjacent to the water inlet, wherein a predetermined amount of condensate water is arranged to be pumped into the main heater body through the water inlet. The condensate water passing through the water inlet is arranged to be injected into the heat exchange compartment through the injection nozzle for creating a negative pressure in the heat exchange compartment. The negative pressure drawing a predetermined amount of steam to enter the heat exchange compartment for mixing with the condensate water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GU XUEDONGANAHEIM CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Xuedong Anaheim, US 2 0
Tong, MingWei ChongQing, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00