Large manipulator and hydraulic circuit arrangement for a large manipulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10788055
SERIAL NO

16660516

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manipulator for concrete pumps having an articulated boom with at least two boom arms and a hydraulic drive that pivots one or more of the boom arms. A hydraulic cylinder has piston and rod side working volumes. A hydraulic circuit has a first switching state in which the hydraulic circuit connects a first working port for feed or discharge of hydraulic fluid to the rod-side working volume and connects a second working port for feed or discharge of hydraulic fluid to the piston-side working volume. In a second switching state, the hydraulic circuit separates the first working port from the first fluid channel and thereby connects the first fluid channel to the second fluid channel for the feed of hydraulic fluid from the rod-side to the piston side working volume. A sensor acquires an operating state variable based upon which an activation assembly sets the switching state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PUTZMEISTER ENGINEERING GMBH72631 AICHTAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diebold, Martin Reutlingen, DE 4 12
Münzenmaier, Werner Nürtingen, DE 4 10
Zirbs, Roman Weil der Stadt, DE 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00