Method for producing intensified whole-cereal flour by means of pulsed electric fields in collaboration with ultrafine pulverization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10785983
APP PUB NO 20180242597A1
SERIAL NO

15755162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for producing intensified whole-cereal flour by means of pulsed electric fields in collaboration with ultrafine pulverization, which includes: (1) preparing bran, middling and flour by cleaning, modulating and milling cereal grains; (2) performing superfine pulverization on the bran and the middling and performing sieving; (3) preparing a suspension by using water and the sieved bran and middling, and stirring constantly; (4) adding polysaccharide colloids into the suspension, and adjusting the pH to 4.0; (5) performing high-voltage pulse treatment on the suspension to ensure stable flow of the suspension; (6) centrifuging the suspension to separate the supernatant, and drying the obtained precipitate and performing sieving to obtain the treated bran and middling; and (7) mixing the treated bran and middling with flour uniformly to obtain whole-cereal flour.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUTH CHINA UNIVERSITY OF TECHNOLOGY510640 NO FIVE 381 MOUNTAIN ROAD GUANGZHOU GUANGDONG TIANHE DISTRICT GUANGZHOU CITY GUANGDONG PROVINCE 510640

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Zhong Guangzhou, CN 11 13
Hong, Jing Guangzhou, CN 25 14
Liu, Zhiwei Guangzhou, CN 46 92
Zeng, Xin'an Guangzhou, CN 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00