Method and apparatus for rapid recovery of optical power after transient events in C+L band optical networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10784955
SERIAL NO

16683051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical device having an amplifier and a controller is described. The amplifier is configured to amplify an optical signal in at least one of the C-Band or the L-Band. The controller includes a processor and a non-transitory computer readable medium. The non-transitory computer readable medium storing computer executable code that when executed by the processor causes the processor to: select a target tilt and gain setting from a plurality of target tilt and gain settings stored in the non-transitory computer readable medium based on the type of fault event message responsive to a fault event message affecting the C-band or the L-Band. The selected and pre-calculated target tilt and gain settings are applied to the amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINERA CORP9005 JUNCTION DRIVE ANNAPOLIS JUNCTION MD 20701

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buset, Jonathan M San Jose, US 5 10
Sanders, Steve Los Altos, US 23 188
Xu, Xian San Francisco, US 13 45
Yilmaz, Omer F Palo Alto, US 7 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00