Semiconductor memory device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10784280
SERIAL NO

16293692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor memory device includes the following structure. First conductive layers are stacked in first direction and extends in second and third directions. The first conductive layers each includes a pair of first portions, and second and third portions. The first portions extend in second direction, is provided separately from each other in third direction and includes a metal. The second portion is provided between the first portions and includes silicon. The third portion is provided on at least one side of the second portion in second direction, extends in third direction, electrically connects the first portions and includes a metal. Memory pillars extend through the second portions in first direction. Contact plugs are respectively provided on the third portion of one of the first conductive layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIOXIA CORPORATIONTOKYO 108-0023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukushima, Takashi Yokkaichi, JP 114 1188
Ohtori, Hiroyuki Yokkaichi, JP 12 67
Seto, Satoshi Kamakura, JP 41 620

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00