Thorium molten salt assembly for energy generation including solid Thorium rods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10784009
SERIAL NO

16724509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Thorium molten salt energy system is disclosed that includes a proton beam source for producing a proton beam, that can vary between a first energy level and a second energy level of, where the generated proton bean can be directed into a main assembly containing both Thorium-containing molten salt and Thorium fuel rods, each containing an inner Beryllium element and an outer solid Thorium element. The generated proton beam can be shaped and directed to impinge upon Lithium within the molten salt to promote the generation of thermal neutrons and the fission of Uranium within the molten salt. The generated proton beam can also be shaped and directed to impinge upon the Beryllium within the Thorium fuel rods to promote the generation of high energy neutrons.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS THORIUM LLC602 PINEHAVEN DR HOUSTON TX 77024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frost, Holloway H Houston, US 60 2254
Hassan, Yassin A College Station, US 11 26
Parker, Trevor D College Station, US 10 22
Shao, Lin College Station, US 36 163
Vaghetto, Rodolfo Miami, US 10 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00