Device for removing foreign objects from nuclear reactor vessel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10784005
APP PUB NO 20180358140A1
SERIAL NO

15838399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for removing foreign objects from nuclear reactor vessel includes a suction pipe; a suction opening structure disposed at a lower end of the suction pipe, an electric valve disposed at a connection of the suction pipe and the suction opening structure, a filter mesh and a suction pump sequentially located in the suction pipe and above the electric valve. The suction opening structure has a suction opening thereon, a water inlet of the suction pump is communicated with the suction opening, and a water outlet of the suction pump is communicated with the outside space of the suction pipe though a drainage pipe. The device further includes a touch switch disposed on the filter mesh which is in operative connection with the electric valve. A foreign object impact force to the filter mesh triggers the touch switch to close which causes the electric valve to close.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SICHUAN XINGZHI ZHIHUI INTELLECTUAL PROPERTY OPERATION CO LTD610000 SICHUAN CITY OF CHENGDU PROVINCE HIGH TECH ZONE SUB ROAD NO 88 2 10 STOREY BUILDING NO 1002 CHENGDU CITY SICHUAN PROVINCE 610000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Liping Sichuan, CN 28 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00