Froth washing prior to naphtha dilution

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10781375
APP PUB NO 20190078024A1
SERIAL NO

16123961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for processing bitumen froth to produce a diluted bitumen product having a reduced water and solids content is provided, comprising: adding a sufficient amount of water to the bitumen froth and mixing the bitumen froth and water to form a froth/water mixture; diluting the froth/water mixture with naphtha to form a diluted froth; and separating the water and solids from the diluted froth to produce the diluted bitumen product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNCRUDE CANADA LTD IN TRUST FOR THE OWNERS OF THE SYNCRUDE PROJECT AS SUCH OWNERS EXIST NOW AND IN THE FUTURE9421 17 AVENUE NW EDMONTON ALBERTA T6N 1H4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bhattacharya, Sujit Edmonton, CA 15 9
Leung, Allan W K Edmonton, CA 1 0
Ng, Yin Ming Samson Sherwood Park, CA 10 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00