Adjustable track start swimming starting block

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10780367
SERIAL NO

15992492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A track start wedge includes a housing, a ratchet gear assembly, and a locking pawl assembly. The ratchet gear assembly is disposed at least partially within the housing and includes a bar, a pinion gear at each end of the bar, and a ratchet gear between the ends of the bar. The locking pawl assembly is coupled to the housing and includes a locking pawl disengageably coupled to the ratchet gear and a spring operable to bias the locking pawl into engagement with the ratchet gear. The ratchet gear assembly is configured to rotate in unison in a first direction toward a front of the housing and a second direction toward a rear of the housing, but the locking pawl prevents rotation of the ratchet gear in the second direction when the locking pawl is engaged with the ratchet gear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVERLAST CLIMBING INDUSTRIES INC5500 LAKELAND AVENUE NORTH CRYSAL MN 55429

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clagett, Shane Stevensville, US 4 8
Florin, John Missoula, US 1 3
Henry, Charles Missoula, US 4 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00