Charger, terminal device, and charging system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10778031
APP PUB NO 20200136402A1
SERIAL NO

16715894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charger, including a power conversion circuit, a charging interface, and an overcurrent protection circuit, where the charging interface includes a power cable, a ground cable, a signal cable, a resistor and a switch device, where a first end of the resistor is connected to the power cable, a second end of the resistor is connected to the signal cable, in a process in which the charger charges a terminal device and when a difference between a voltage of a first end of the switch device and a voltage of a second end of the switch device is greater than or equal to a first voltage threshold, the second end and a third end of the switch device are connected such that the power cable and the ground cable are connected to generate an overcurrent, and the overcurrent protection circuit controls the power conversion circuit to stop current output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTDHUAWEI ADMINISTRATION BUILDING BANTIAN LONGGANG DISTRICT SHENZHEN 518129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Shuo Shenzhen, CN 341 1004
Lu, Haizhao Shenzhen, CN 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00