Bicycle sprocket assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10774915
APP PUB NO 20180346066A1
SERIAL NO

15608931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle sprocket assembly comprises a plurality of sprockets and a first support element. The plurality of sprockets is arranged coaxially about a rotational center axis of the bicycle sprocket assembly. The plurality of sprockets includes a first sprocket. The first sprocket includes a first toothed ring and a first sprocket body at least partly disposed radially inwardly of the first toothed ring with respect to the rotational center axis. The first toothed ring is made of a first material. The first sprocket body is made of a second material that is different from the first material. The first support element extends from the first sprocket to a second sprocket adjacent to the first sprocket in an axial direction with respect to the rotational center axis. The first support element is made of a first additional material that is different from the second material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIMANO INCSAKAI CITY OSAKA 590-8577

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwai, Tooru Sakai, JP 14 197
Nonoshita, Tetsu Sakai, JP 31 779
Yoshida, Toyoshi Sakai, JP 21 347

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00