Tappet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10774692
SERIAL NO

16607918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tappet is proposed, for a fuel pump or for a valve timing gear, in each case of an internal combustion engine, comprising a hollow-cylindrical housing, which includes two separate portions lying in line one after the other, which are fitted together in a region of their facing inner faces and are permanently connected to one another by way of a joint. The tappet has a roller on its driving side and an abutment for a follower part on its driven side, which abutment is formed on a separate insert. The abutment is radially supported on the housing in the fitted-together region of the two portions, wherein the insert has a middle annular collar, from which on the one hand a sleeve portion protrudes in the direction of the driving side and on the other hand a dome-like attachment protrudes towards the driven side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHAEFFLER TECHNOLOGIES AG & CO KGINDUSTRIESTRASSE 1 - 3 91074 HERZOGENAURACH 91074

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Backert, Georg Mühlhausen, DE 3 12
Dotterweich, Michael Burgebrach, DE 3 12
Fichtner, Alexander Memmelsdorf, DE 4 7
Geyer, Norbert Höchstadt, DE 39 381
Reichel, Matthias Obertrubach, DE 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00