Methods and devices for improving the subsoil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10774494
APP PUB NO 20170370067A1
SERIAL NO

15535199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The object of the present invention relates to a method for producing drilled piles, wherein a drilling tool is sunk into the subsoil by applying a drilling torque and a vertical force, the drilling tool is then again retracted and an additional material is introduced into the resulting bore. According to the invention, the drilling tool is set in vibration by one or more actuators while it is sunk into the subsoil and/or during the retraction of the drilling tool, wherein a resulting oscillation amplitude has at least one horizontal portion. The invention also relates to a corresponding drilling tool for producing boreholes or drilled piles in a subsoil. The present invention further relates to a depth vibrator for the displacement and consolidation of subsoil material as well as a method for the displacement and consolidation of subsoil material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KETTNER MAIK10245 BERLIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kettner, Maik Berlin, DE 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00