Method for producing a sleeper for use in the railway track superstructure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10774477
APP PUB NO 20190119859A1
SERIAL NO

16094335

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method which enables sleepers to be produced for the railway track superstructure having optimised performance characteristics, in a reliable and cost-effective manner. The method according to the invention provides the following production steps: a) providing a mixture 10-60 % mass of which consists of a granulate of a plastic, which is deformable by applying heat, and the remainder of which consists of a sand having a bulk density of 1.4-2.0 g/cm3; b) heating the mixture to a temperature of 150-200° C.; c) pouring the mixture into a press mould reproducing the sleeper; d) pressing the mixture in the mould at a pressing pressure measured in the mixture of 1-5 MPa over a pressing period of up to 60 minutes; and e) removing the sleeper from the mould.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOSSLOH-WERKE GMBH58791 WERDOHL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bösterling, Winfried Neuenrade, DE 26 77
Bednarczyk, Adrian Luedenscheid, DE 18 81
Schröder, Nicolas Dortmund, DE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00