Water electrolysis system and method of stopping operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10767272
APP PUB NO 20190024248A1
SERIAL NO

16034480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water electrolysis system is equipped with a water electrolysis device, a water supply passage, a hydrogen supply passage, a gas-liquid separator, a first water drainage passage, a first water drainage valve, a second water drainage valve, a determination unit, and a valve control unit. In a method of stopping operation of the water electrolysis system, in a water drainage step, in the case that the determination unit determines that operation of the water electrolysis device has been stopped, the first water drainage valve is controlled to be placed in a valve open state, thereby draining liquid water from the gas-liquid separator into the first water drainage passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTD1-1 MINAMI-AOYAMA 2-CHOME MINATO-KU TOKYO 1078556 ?1078556

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukushima, Yukihiro Wako, JP 10 28
Kurashina, Daisuke Wako, JP 29 77
Takeuchi, Jun Wako, JP 90 709

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00