Crimp terminal having a groove for facilitating crimping workability and a water stop member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10763597
APP PUB NO 20180261931A1
SERIAL NO

15978360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crimp terminal includes a terminal connection portion electrically connected to a counterpart terminal; and a plate-shaped electric wire connection portion electrically connected to an end portion of an electric wire placed on an inner wall surface side by a crimping process during which the electric wire connection portion is sandwiched between a first die and a second die. The electric wire connection portion includes a bottom on which the end portion of the electric wire is placed in the crimping process, and first and second barrel pieces that are extended from both ends of the bottom and are rolled to a region from a tip core to a coating at an end portion of the electric wire by the crimping process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATION4-28 MITA 1-CHOME MINATO-KU TOKYO 108-8333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Masashi Shizuoka, JP 34 243

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00