Model-based refinement of the placement process in integrated circuit generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10762271
APP PUB NO 20200104453A1
SERIAL NO

16145993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of performing model-based refinement of a placement of components in integrated circuit generation select one of the components as a candidate component and postulate a move of the candidate component from an original position to a new position. The method includes defining nets associated with the candidate component. An initial perimeter and a new perimeter associated with each of the one or more nets are defined. The initial perimeter includes the candidate component at its original position and the new perimeter includes the candidate component at its new position. The method includes quantifying a change from the initial perimeter and the new perimeter and the original position and the new position, and obtaining a model of wires interconnecting the candidate component to the components of each of the nets. A result of the placement is provided for manufacture of the integrated circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Myung-Chul Travis, US 89 991
Nam, Gi-Joon Chappaqua, US 92 1033
Ramji, Shyam LaGrange, US 49 505
Trombley, Benjamin N Hopewell Junction, US 1 0
Villarrubia, Paul G Austin, US 45 436

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00