Assembly and electrical connection part for at least two electrical energy storage cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10756323
APP PUB NO 20160372734A1
SERIAL NO

15122341

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The main purpose of the invention is an assembly and electrical connection part (2) of at least two electrical energy storage cells (1), that will be included in an electric assembly module (20) of an energy storage system, characterised in that the part (2) comprises first (3a) and second (3b) means of connecting the part (2) to said at least two electrical energy storage cells (1), the first (3a) and second (3b) connection means being configured to enable the passage of connection pins (4) to assemble and electrically connect the part (2) to each of said at least two electrical energy storage cells (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESBAT LE PONANT 25 RUE LEBLANC PARIS 75015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azais, Philippe Saint Egreve, FR 16 63
Berthe, De Pommery Yves Grenoble, FR 4 1
Picard, Lionel Seyssinet Pariset, FR 32 57
Turin, Guillaume Lille, FR 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00