Steam turbine pipe and pipe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10753543
APP PUB NO 20190120436A1
SERIAL NO

16223398

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam turbine pipe 1 of an embodiment includes: an upper half side main steam pipe 11 that leads steam to a steam turbine; an upper half side main steam control valve 30 that intervenes in the upper half side main steam pipe 11; and a post-valve drain pipe 31 that is connected to the upper half side main steam control valve 30 and leads drain to an outside. The steam turbine pipe 1 further includes: a shut-off valve 32 that intervenes in the post-valve drain pipe 31; and a branching pipe 60 that makes the post-valve drain pipe 31 on the side closer to the upper half side main steam control valve 30 than is the shut-off valve 32 communicate with the upper half side main steam pipe 11 between the upper half side main steam control valve 30 and a high-pressure turbine 200.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asakura, Daisuke Kawasaki, JP 19 20
Endo, Toshihiko Yokohama, JP 16 710
Kanbe, Koji Kawasaki, JP 5 4
Nakamura, Yuichi Yokohama, JP 141 1507
Nishi, Hiroyuki Yokohama, JP 33 482
Ohfuji, Tomoo Yokohama, JP 3 1
Ooishi, Tsutomu Yokohama, JP 10 46
Shioyama, Tsutomu Yokohama, JP 20 104
Shiraishi, Hiroki Yokohama, JP 5 1
Takahashi, Makoto Yokohama, JP 401 4129
Tao, Hiroyuki Kawasaki, JP 4 10
Yamanaka, Tetsuya Yokohama, JP 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00