Integrated hydrothermal process to upgrade heavy oil

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10752847
APP PUB NO 20180258353A1
SERIAL NO

15914667

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated hydrothermal process for upgrading heavy oil includes the steps of mixing a heated water stream and a heated feed in a mixer to produce a mixed fluid, introducing the mixed stream to a reactor unit to produce a reactor effluent that includes light fractions, heavy fractions, and water, cooling the reactor effluent in a cooling device to produce a cooled fluid, depressurizing the cooled fluid in a depressurizing device to produce a depressurized fluid, introducing the depressurized fluid to a flash drum configured to separate the depressurized fluid into a light fraction stream and a heavy fraction stream. The light fraction stream includes the light fractions and water and the heavy fraction stream includes the heavy fractions and water. The process further includes the step of introducing the heavy fraction stream to an aqueous reforming unit that includes a catalyst to produce an aqueous reforming outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Nasir, Ali S Dhahran, SA 7 22
Alotaibi, Bader M Dhahran, SA 6 16
Choi, Ki-Hyouk Dhahran, SA 130 1013
Fathi, Mazin M Dhahran, SA 29 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00