Architectural membrane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10751973
APP PUB NO 20170266914A1
SERIAL NO

15464909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite fabric laminate can include an open mesh fabric, a first continuous film comprising a fluoropolymer, and a second continuous film comprising a fluoropolymer. The fluoropolymer of the first continuous film and the fluoropolymer of the second continuous films can be in direct contact with one another. A method of forming a composite fabric laminate that includes disposing an open mesh fabric between a first continuous film and a second continuous film, each comprising an at least partially unsintered fluoropolymer film, to form a composite; laminating the composite at a pressure of at least 100 psig and a temperature of no greater than 350° C.; and sintering the laminated composite to form the composite fabric laminate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN PERFORMANCE PLASTICS CORPORATION31500 SOLON ROAD SOLON OH 44139

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cushman, Michael P Williamstown, US 13 125
Lussier, Michael J Hooksett, US 6 16
McMartin, James M Hooksett, US 6 2
Sargent, Joseph G Lowell, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00