Robotic arm

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10751873
SERIAL NO

16188858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A robotic arm includes a first driving source and a second driving source mounted on a base frame, a first transmission link driven by the first driving source to turn around a first axis, a second transmission link driven by the second driving source to turn around a second axis that is parallel to the first axis, a third transmission link pivoted to the first transmission link, a first driven link pivoted to the second transmission link, a second driven link pivotally coupled between the first driven link and the base frame, a third driven link pivotally connected with the first and second driven link, and a fourth driven link pivotally coupled between the third driven link and the third transmission link. Thus, the robotic arm of the invention has a compact size and can achieve multi-degree of freedom motion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HIWIN TECHNOLOGIES CORPNO 7 JINGKE ROAD NANTUN DISTRICT TAICHUNG CITY 40852

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Cheng-Chin Taichung, TW 4 7
Chu, Yu-Lin Taichung, TW 37 98
Wang, Ren-Jeng Taichung, TW 19 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00