Single line passive optical network converter module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10749609
SERIAL NO

16543148

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A single line converter module comprises a housing; an environmentally hardened fiber optic connector located in the housing and configured to be optically coupled to a service terminal for receiving downstream optical frames; a single electrical connector located in the housing and coupled over a metallic medium to a network terminal providing a service to respective customer premise equipment (CPE); and an optical-to-electrical (O/E) converter located in the housing and configured to convert the downstream optical frames to an electrical signal for transmission over the metallic medium to the network terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COMMSCOPE CONNECTIVITY UK LIMITED; COMMSCOPE CONNECTIVITY BELGIUM BVBA; COMMSCOPE TECHNOLOGIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, David Suffolk, GB 466 9390
Erreygers, Jan Jozef Julia Maria Tielt-Winge, BE 22 149
Franckx, Joris Bonheiden, BE 12 396
Mather, David Cheshire, GB 14 95
Shaddock, Robert Neil Doylestown, US 8 19
Weeks, William Atley Ivyland, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00