Tire and method of manufacturing rubber composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10745545
APP PUB NO 20180171116A1
SERIAL NO

15577058

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure is to provide a method of manufacturing a rubber composition comprising kneading a rubber composition that includes 100 parts by mass (pbm) of a rubber component (A) including 50 mass % or more of natural rubber, 5-50 pbm of at least one kind of thermoplastic resin (B) selected from among C5-based resins, C5-C9-based resins, C9-based resins, terpene-based resins, terpene-aromatic compound-based resins, rosin-based resins, dicyclopentadiene resins, and alkylphenol-based resins; 20-120 pbm of a filler (C) including silica; at least one kind of vulcanization accelerator (D) selected from among guanidines, sulfenamides, thiazoles, thiourea and diethyl thiourea; a silane coupling agent (E); and a vulcanizing agent (F). The kneading comprises a kneading stage A for kneading components (A)-(C), part or all of component (D), and 2 pbm or more of component (E), and a kneading stage B for kneading component (F) with a kneaded product of the kneading stage A.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIDGESTONE CORPORATION10-1 KYOBASHI 1-CHOME CHUO-KU TOKYO 1048340

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakurai, Hideyuki Tokyo, JP 66 212

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00