Additive manufacturing apparatus and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10744598
APP PUB NO 20180154484A1
SERIAL NO

15576035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing apparatus and corresponding method for building an object by layerwise consolidation of material wherein the apparatus includes a build enclosure containing a build support for supporting the object during the build, a material source for providing material to selected locations for consolidation, a radiation device for generating and directing radiation to consolidate the material at the selected locations and an acoustic sensing system. The acoustic sensing system may be arranged to detect acoustic signals generated in the build enclosure by consolidation of the material with the radiation. The acoustic sensing system may be a passive acoustic sensing system arranged to detect acoustic signals generated in the build enclosure that are indicative of at least one condition of the building process and/or the object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENISHAW PLCGLOUCESTERSHIRE GLOUCESTERSHIRE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, Liam David East Lothian, GB 6 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00