Trolley-wire display device, trolley-wire display system, and trolley-wire display data creation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10740936
SERIAL NO

16348382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a trolley-wire display device, a display reference point of point-group data is set for each point on a trolley wire having a height and a displacement measured based on a reference obtained from rails. First and second points on a track center line are used to calculate a first distance, and a third distance based on the first distance and a second distance. The first point corresponds to the display reference point. The second point corresponds to each point on the trolley wire. The first distance is a distance from the first point to each second point. The second distance is a distance from a positional start point to the first point. The third distance is a distance from the start point to each second point, and is used to create display data for displaying a height and a displacement of each point on the trolley wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Irie, Megumi Tokyo, JP 6 22
Kamei, Katsuyuki Tokyo, JP 13 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00