Power generating element and power generating device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10734922
APP PUB NO 20190131890A1
SERIAL NO

15758634

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generating element 1 according to an embodiment includes a displacement member 10, a displacement member 20, and a fixed member 30. The displacement member 10 and the displacement member 20 are connected via an elastic deformation body 41. The displacement member 10 is connected to an attachment section 51 via an elastic deformation body 42. The displacement member 10 and/or the displacement member 20 includes a first power generation surface. The fixed member 30 includes a second power generation surface opposed to the first power generation surface. An electret material layer is provided on one surface of the first power generation surface and the second power generation surface. A counter electrode layer is provided on the other surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRI-FORCE MANAGEMENT CORPORATION27 SUGAYA 4-CHOME AGEO-SHI SAITAMA-KEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okada, Kazuhiro Saitama-ken, JP 169 5408
Okada, Miho Saitama-ken, JP 24 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00