Boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10730014
APP PUB NO 20180193796A1
SERIAL NO

15741814

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This boiler has a flue in which a reducing agent supplying device and a selective reduction catalyst are provided, a bypass flow path bypassing economizers is provided, and a first closing device partially closing the bypass flow path and a second closing device partially closing the flue are also provided. A plurality of first closing members, serving as the first closing device, are provided along the direction in which exhaust gas flows through the flue at a predetermined spacing in the width direction of the flue. A plurality of second closing members, serving as the second closing device are provided along the vertical direction at a predetermined spacing in the width direction of the flue. The first closing members and the second closing members are arranged so as to be displaced from each other in the width direction of the flue.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isobe, Tomoaki Kanagawa, JP 3 1
Kako, Hiroshi Kanagawa, JP 6 104
Miyanishi, Hideo Kanagawa, JP 7 9
Oda, Manabu Tokyo, JP 7 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00