Fuel cell system including rupture part between hydrogen supply valve and hydrogen shut-off valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10727507
APP PUB NO 20180175422A1
SERIAL NO

15612061

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system including a hydrogen shut-off valve and a hydrogen supply valve connected therewith, the fuel cell system including: a holder capable of accommodating the hydrogen supply valve, wherein the holder includes a rupture part which may be formed at one point between the hydrogen supply valve and the hydrogen shut-off valve, and the hydrogen shut-off valve may be accommodated in one or more extended ends of the holder, and when the rupture part is cut off by external shock the hydrogen shut-off valve and the hydrogen supply valve are disconnected from each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Se Kwon Seoul, KR 29 78
Kwon, Bu Kil Suwon-si, KR 24 73
Shim, Hyo Sub Suwon-si, KR 22 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 28, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00