Multi-port inductors and transformers for accurately predicting voltage-controlled oscillator (VCO) frequency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10715153
SERIAL NO

16517103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus and associated methods relate to automatically generating a data structure representation of an on-chip inductive-capacitive (LC) tank circuit by determining parasitic inductances in each of the segments of conductive paths that connect a main inductor to one or more selectable VCO components such as capacitors and varactors, for example. In an illustrative example, one or more of the selectable VCO components may be arranged, when selected, to form a parallel resonant LC tank with the main inductor. A method may include defining nodes ai terminating each of the segments along the conductive paths between the main inductor terminals and a drive circuit. By modelling the paths as multi-port inductors and transformers, resonant frequency of the VCO may be more accurately predicted by simulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XILINX INC2100 LOGIC DRIVE SAN JOSE CA 95124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bekele, Adebabay M San Jose, US 22 139
Jing, Jing San Jose, US 23 119
Turker, Melek Didem Z San Jose, US 11 47
Upadhyaya, Parag Los Gatos, US 62 381

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00