Method and device for generation of electric power and cold using low-potential heat sources

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10712057
APP PUB NO 20180363957A1
SERIAL NO

15780531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for generating electricity and cold and a device for realizing same, consists in a closed absorption cycle in which a working body is a mixture of a low-boiling (refrigerant) component and a high-boiling (absorbent) component. The method involves evaporating a strong solution in a steam generator, thus forming a refrigerant vapor and a weak solution, expanding the refrigerant vapor in a turbine, thus producing work, and, after the turbine, absorbing spent vapor in an absorber, forming a strong solution. A distinguishing feature of the method consists in changing the concentration of a strong solution using two stages, including not only evaporation but also filtration. The proposed method and device allow for significantly increasing the efficiency of systems for generating electricity relative to analogous known methods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WASTE TO ENERGY GENERATING INC300-155 UNIVERSITY AVENUE TORONTO ONTARIO M5H 3B7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Samkhan, Igor I Yaroslavl, RU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00