Combustion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10712001
APP PUB NO 20190093888A1
SERIAL NO

16134466

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The combustion device includes: a burner; an igniter; a fuel supply unit that supplies fuel to the burner; a blower fan that supplies air for combustion; an exhaust port that discharges combustion exhaust; a device control unit that, before ignition of fuel supplied to the burner by operation of the igniter, performs air purge of the burner at a predetermined air blowing amount by driving the blower fan; and a setting means that is set when a check valve for preventing back flow of exhaust is connected to the exhaust port. When the setting means is set to indicate that the check valve is connected, the device control unit controls the operation of the blower fan so that slow-start air purge is performed in which the time interval from the start of air purge until the predetermined air blowing amount is reached becomes longer, than in the case in which no such check valve is connected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATIONHYOGO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kinugasa, Tomofumi Kobe, JP 8 64
Kuriyama, Tetsunori Kobe, JP 2 5
Kusakabe, Makoto Kobe, JP 8 11
Mandai, Keiichi Kobe, JP 1 0
Masumoto, Kentaro Kobe, JP 1 0
Sato, Isao Kobe, JP 92 1733
Tanaka, Hiroaki Kobe, JP 532 5487

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00