System and method for continuously manufacturing optical display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710351
APP PUB NO 20170348957A1
SERIAL NO

15604970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for continuously manufacturing an optical display device and methods thereof are described. The system and method include a feeding unit for feeding an optical film, which includes a release film and a plurality of sheet pieces of a polarized film. The system and method further include a peeling unit for peeling the sheet pieces of the polarized film; a winding unit for winding the release film form the sheet pieces of the polarized film; and a controlling unit. The controlling unit controls at least one of the feeding unit, the winding unit, and the laminating unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHANJIN OPTOELECTRONICS (NANJING) CO LTDNANJING JIANGSU 210038

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Hang Suk Daejeon, KR 22 56
Jang, Eung Jin Daejeon, KR 37 80
Jeung, Bong Su Daejeon, KR 17 15
Lee, Beom Seok Daejeon, KR 66 214
Lee, Suk Jae Daejeon, KR 20 86
Nam, Pil Soo Daejeon, KR 2 3
Park, Cheon Ho Daejeon, KR 20 313
Park, Kyung Hyeok Daejeon, KR 11 11
Park, San Daejeon, KR 18 16
Ryoo, Jea Han Daejeon, KR 17 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00