Foam block and poured concrete wall system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10704257
SERIAL NO

16436971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A foam block and poured concrete building system preferably includes a plurality of wall foam blocks, a plurality of corner foam blocks, poured concrete, a plurality of fastening strips and a plurality of fasteners. Two end cavities are formed in opposing ends of the plurality of wall foam blocks. Top and bottom cavities are formed in the plurality of wall foam blocks. Each corner foam block includes an inner angle plate, three middle spacers and an outer angle plate. Each fastening strip includes a plurality of holes formed at heights that correspond to a height of the plurality of wall foam blocks and the plurality of corner foam blocks. Window frames and doorframes include a plurality of fastening strips. When the plurality of wall and corner foam blocks are assembled to each other with the plurality of fastening strips and fasteners, concrete is poured into vertical cavities therein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MORAN JAMESARLINGTON VA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moran, James Stanley, US 18 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 7, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00