Method to enhance operation efficiency of water turbines and to reduce cavitation of components thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697423
APP PUB NO 20200141380A1
SERIAL NO

16181531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method to dispose at least one air guiding tube between a penstock and a water turbine installed on a dam to form negative pressure at an outlet of the air guiding device by the water kinetic energy produced from high speed of water flow to take in external air for pressurizing, so as to produce a plurality of pressured air bubbles mixed into the water. The water with pressured air bubbles would be decompressed when flowing to an exit of the penstock and has their volumes increased, so as to enhance the water kinetic energy for driving the water turbine more efficiently; meanwhile the method can prevent from production of cavities and further avoid damages of the components of the water turbine from cavitation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIN ZUEI LINGNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Zuei-Ling Taipei, TW 9 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00