Hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697418
APP PUB NO 20190277240A1
SERIAL NO

16244437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a hybrid vehicle that includes a power train including an internal combustion engine equipped with a plurality of cylinders and a drive motor unit. The drive motor unit includes an electric motor coupled to the internal combustion engine without a clutch. The internal combustion engine includes one or more decompression devices that are each installed for a subset of one or more cylinders and that operate to release compression pressure in the subset of one or more cylinders in at least one of the course of an engine stop and course of an engine start-up in which combustion is not performed. The subset of one or more cylinders are selected such that, when the one or more decompression devices are operating, compression is not produced sequentially in cylinders that are adjacent to each other in terms of the firing order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyashita, Shigeki Susono, JP 62 783

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00