Combined heat and power plant and a method for improving the burning process in a combined heat and power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697363
APP PUB NO 20190178153A1
SERIAL NO

16324581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined heat and power plant includes a gasifier, a heat exchanger arranged to reduce the temperature of the raw synthesis gas formed in the gasifier by exchanging the heat of the raw synthesis gas into heating medium used for heating and forming cooled raw synthesis gas, a filtration unit for cleaning the cooled raw synthesis gas to form refined synthesis gas suitable as a fuel for an internal combustion engine, an internal combustion engine where the refined synthesis gas is burnt to produce mechanical power, ducts for connecting different parts of the plant to each other a raw gas burner arranged after the gasifier to burn the raw synthesis gas formed in the gasifier during the time when the refined synthesis gas is not utilized in the internal combustion engine. A method for treating raw synthesis gas a combined heat and power plant is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOLTER OY90450 KEMPELE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haapakoski, Jarno Kempele, FI 1 1
Kaaresto, Jani Kiiminki, FI 1 1
Korva, Iikka Lumijoki, FI 1 1
Terho, Esa Ruuki, FI 1 1
Ylikoski, Iikka Kempele, FI 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00